|
|
|
|
|
|
|
Gear lever |
|
1/2 done, cut some grooves, bent it and gonna weld it |
|
|
|
|
|
|
|
|
|
|
Pedals |
|
Not pretty, but functional also not finished |
|
|
|
|
|
|
|
|
|
|
Back Panel |
|
This photo is staged so you can see how we bent the top over the bar |
|
|
|
|
|
|
|
|
|
|
Top done |
|
You can see it works quite well |
|
|
|
|
|
|
|
|
|
|
Bottom |
|
We used a plank of wood clamped to the back to ensure we got a good bend |
|
|
|
|
|
|
|
|
|
|
Air Power |
|
Air powered angled drill, lovely :) |
|
|
|
|
|
|
|
|
|
|
Air Power |
|
Air powered riveter, lovely |
|
|
|
|
|
|
|
|
|
|
Finishing |
|
Finishing the rear panel |
|
|
|
|
|
|
|
|
|
|
More Riveting |
|
Mmm, Video clip available in the 'Video' section |
|
|
|
|
|
|
|
|
|
|
Wheel Arch |
|
We used rivets again for the rear wheel arches. Looks almost finished in this photo |
|
|
|
|
|
|
|
|
|
|
Front Wings |
|
.. are on now, probably be coming off again for some reason |
|
|
|
|
|
|
|
|
|
|
Full View |
|
End of day photo |
|
|
|
|
|
|
|
|
|
|
Rear Lights on |
|
Actually it's just gaffer taped on to see how it looks. |
|
|
|
|
|
|
|
|
|
|
Wiring tidied up |
|
It all runs down the black conduit, the green wire you can see is for the handbrake switch |
|
|
|
|
|
|
|
|
|
|
Engine Wiring |
|
All tidied up in the conduit again, see the green wire near the master cylinder |
|
|
|
|
|
|
|