|
|
|
|
|
|
|
Dashboard Stage 3 |
|
Glued foam onto MDF and then 'leather-a-like' to the foam and stapled around the back. Next to find some perspex. |
|
|
|
|
|
|
|
|
|
|
Wings |
|
Front cycle wings are now on but need removing to paing the wing stays. |
|
|
|
|
|
|
|
|
|
|
Dashboard |
|
Almost complete but not quite, I think it looks quite nice. |
|
|
|
|
|
|
|
|
|
|
So far |
|
Picture of the car so far. |
|
|
|
|
|
|
|
|
|
|
In the open |
|
The car out of the mud and onto a workable surface |
|
|
|
|
|
|
|
|
|
|
Brake pipes |
|
Brake pipes are in position now, just need to sort out the flexi hoses |
|
|
|
|
|
|
|
|
|
|
|
More Pipes |
|
Both the fuel and brake pipes are running inside the tunnel |
|
|
|
|
|
|
|
|
|
|
Flexi missing |
|
Just a flexi pipe to sort the back end out |
|
|
|
|
|
|
|
|
|
|
Fuel pipes |
|
shown from the back of the car |
|
|
|
|
|
|
|
|
|
|
1st Panel |
|
This is the first panel cut roughly to size |
|
|
|
|
|
|
|
|
|
|
Tense moment |
|
Used a piece of wood clamped to the chassis and bent the ali over by hand then hammered it down with a soft hammer |
|
|
|
|
|
|
|
|
|
|
Rivetting |
|
One of our best buys was the air rivet gun |
|
|
|
|
|
|
|
|
|
|
|
Back into it |
|
After moving house and the winter we're back into the build, this is a bracket for the front flexi-hose. |
|
|
|
|
|
|
|